Cabinetry Installation
Install custom cabinetry throughout your home. From kitchen cabinets to bathroom vanities, built-ins, and closet systems, this step transforms empty rooms into functional living spaces with quality storage solutions.
Quick Summary
Typical Cost
$25,000 - $80,000
Time Frame
1-2 weeks
Difficulty
Professional Required
Why Cabinetry Installation Matters
Cabinetry represents one of the largest single investments in your whole-home remodel, typically accounting for 10-15% of your total budget. Quality cabinets installed correctly will last 20-50 years, making proper planning and installation critical for long-term satisfaction.
Beyond aesthetics, cabinets determine how functional your kitchen, bathrooms, and storage areas will be for daily life. Poor layout decisions or installation errors cannot be easily corrected once countertops are installed. The 8-16 week lead time for custom cabinets also means that ordering must happen early in your project timeline.
Modern cabinet features like soft-close hinges, full-extension drawers, and specialized organizers dramatically improve daily usability. Taking time to specify the right accessories and interior fittings during the design phase ensures you get maximum value from your cabinet investment.
Step-by-Step Guide
Finalize Cabinet Designs and Shop Drawings
Review all cabinet shop drawings with your designer and installer before manufacturing begins. Verify every dimension, finish, hardware specification, and accessory selection. Check appliance cutouts match your actual appliances.
- Confirm cabinet heights for ceiling conditions
- Verify sink base sizing for your sink selection
- Check that appliance panels match actual appliances
- Review filler locations and crown molding details
- Approve hardware finish and style selections
Verify Delivery and Staging Logistics
Confirm delivery dates and coordinate cabinet storage. Cabinets need climate-controlled storage and protection from construction dust. Plan delivery to minimize handling and storage time on site.
- Designate clean, dry storage area for cabinets
- Schedule delivery to align with installation start
- Inspect all boxes upon delivery for damage
- Inventory all pieces against packing list
- Report any damage or missing items immediately
Prepare Installation Areas
Ensure all prerequisite work is complete before cabinet installation begins. Walls should be finished and primed, electrical and plumbing rough-ins properly located, and flooring decisions finalized.
- Complete all drywall finishing and priming
- Mark stud locations for cabinet mounting
- Verify outlet and switch locations are correct
- Confirm plumbing rough-in locations match cabinet plans
- Establish level reference lines around rooms
Install Upper Kitchen Cabinets
Begin with upper wall cabinets while you have clear floor access. Use cabinet jacks or a temporary ledger board to support cabinets at the correct height during installation. Secure to studs with proper cabinet screws.
- Mark cabinet bottom line typically 54 inches up
- Install corner cabinets first, then work outward
- Clamp cabinets together before screwing to wall
- Use shims to ensure cabinets are plumb and level
- Screw through cabinet backs into wall studs
Install Base Kitchen Cabinets
Install base cabinets starting from the highest point in the floor. Use shims liberally to achieve level, as base cabinets must be perfectly level for countertop installation. Connect cabinets to each other and secure to wall studs.
- Find highest floor point and start installation there
- Shim up low areas to match highest point
- Connect adjacent cabinets with cabinet screws
- Secure to wall studs through mounting rail
- Check diagonal measurements for square alignment
Install Bathroom Vanities
Set bathroom vanity cabinets with careful attention to plumbing access. Wall-mounted vanities require blocking installed during framing. Confirm drain and supply line locations before final positioning.
- Mark drain and supply locations on vanity back
- Cut access holes for plumbing connections
- Level vanity front-to-back and side-to-side
- Secure wall-mounted units to blocking with lag bolts
- Leave space for countertop overhang if applicable
Install Built-In Cabinetry
Complete built-in entertainment centers, bookcases, mudroom storage, home offices, and other custom millwork. These pieces often require scribe fitting to walls and careful integration with adjacent finishes.
- Scribe side panels to match wall contours
- Install adjustable shelf standards and pins
- Route wiring for electronics before final placement
- Secure to wall studs and floor as required
- Fill and finish visible screw holes
Install Closet Systems
Mount closet organizers, shelving systems, and custom closet cabinetry in all bedrooms and storage areas. Consider a mix of hanging, shelving, and drawer storage based on wardrobe needs.
- Install wall-mounted systems at proper heights
- Position double-hang rods at 42 and 84 inches
- Include mix of long-hang and double-hang sections
- Add drawer units for folded items and accessories
- Include adequate lighting for closet interiors
Install Hardware and Accessories
Attach all cabinet doors, drawer fronts, pulls, knobs, and interior accessories. Use templates for consistent hardware placement. Install interior organizers like lazy Susans, pull-outs, and dividers.
- Install soft-close door hinges and adjust
- Mount drawer slides and test operation
- Use hardware jigs for consistent placement
- Install pull-out trash, recycling, and organizers
- Add under-cabinet lighting connections
Final Adjustments and Touch-Up
Complete final adjustments to all doors and drawers. Fill any nail holes, touch up finish as needed, and install remaining trim pieces like toe kicks, crown molding, and light rails.
- Adjust door hinges for even gaps and alignment
- Fine-tune drawer slides for smooth operation
- Install toe kicks and scribe moldings
- Add crown molding and light valances
- Touch up any scratches or finish damage
Cabinet Quality Levels Comparison
Stock Cabinets
Pre-manufactured in standard sizes, available quickly at lowest cost.
- Cost: $100-200/linear foot
- Lead Time: 1-2 weeks
- Box Material: Particleboard common
- Customization: None - fixed sizes only
- Finish Options: Limited selections
- Best For: Rentals, tight budgets
Semi-Custom Cabinets
More size and finish options with moderate customization available.
- Cost: $200-450/linear foot
- Lead Time: 4-8 weeks
- Box Material: Plywood typical
- Customization: Depth/height adjustments
- Finish Options: Many standard choices
- Best For: Most home remodels
Custom Cabinets
Built to exact specifications with unlimited design options.
- Cost: $500-1,200+/linear foot
- Lead Time: 8-16 weeks
- Box Material: Premium plywood
- Customization: Unlimited options
- Finish Options: Any finish possible
- Best For: High-end, unique spaces
Popular Cabinet Door Styles
Shaker Style
Five-piece door with flat center panel and simple frame. Timeless design that works with traditional and modern interiors. Most popular style for its versatility and clean lines.
Flat Panel (Slab)
Single flat surface with no frames or panels. Creates sleek, contemporary aesthetic. Works well with high-gloss finishes and wood grain patterns.
Raised Panel
Classic traditional style with dimensional center panel. Available in many profile variations. Suits formal kitchens and traditional home styles.
Beaded Inset
Doors set flush within frame with decorative bead detail. Premium craftsmanship required. Traditional, high-end look with precise tolerances.
Cost Breakdown
| Area/Component | Stock | Semi-Custom | Custom |
|---|---|---|---|
| Kitchen (30 linear ft) | $3,000-6,000 | $6,000-13,500 | $15,000-36,000 |
| Master Bath Vanity (6 ft) | $600-1,200 | $1,200-2,700 | $3,000-7,200 |
| Secondary Bath Vanities (x2) | $800-1,600 | $1,600-3,600 | $4,000-9,600 |
| Mudroom/Laundry | $1,000-2,000 | $2,000-4,500 | $5,000-12,000 |
| Built-In Entertainment | N/A | $3,000-6,000 | $6,000-15,000 |
| Master Closet System | $1,500-3,000 | $3,000-6,000 | $6,000-15,000 |
| Installation Labor | $2,000-4,000 | $4,000-8,000 | $6,000-12,000 |
| Whole-Home Total | $12,000-22,000 | $25,000-50,000 | $50,000-110,000 |
Pro Tips
Order Early
Place cabinet orders 12-16 weeks before you need them. Supply chain delays are common, and waiting for cabinets can stall your entire project. Have backup delivery dates planned.
Measure Three Times
Have your installer verify all field dimensions before final cabinet order. Walls are rarely square or plumb. Professional templating catches issues that shop drawings miss.
Invest in Drawer Bases
Deep drawers are more functional than door-and-shelf base cabinets. Everything is visible and accessible. Budget for drawer bases in high-use areas like kitchens.
Consider Full-Extension Slides
Full-extension drawer slides let you access the entire drawer depth. Standard slides hide 4-6 inches in the back. The upgrade cost is minimal for daily convenience.
Protect During Construction
Cover installed cabinets with moving blankets during remaining construction. Dust, debris, and accidental bumps can damage finishes before the project completes.
Plan Lighting Early
Under-cabinet and in-cabinet lighting requires electrical rough-in during framing. Discuss lighting locations with your electrician before walls are closed up.
Common Mistakes to Avoid
Skipping Filler Pieces
Without proper filler strips, drawers may not open fully next to walls or appliances. Always include 3-inch fillers at walls and anywhere drawers need clearance for handles.
Ignoring Appliance Dimensions
Refrigerator, range, and dishwasher cutouts must match actual appliances. Standard sizes vary by manufacturer. Verify exact dimensions from spec sheets before finalizing cabinet layout.
Underestimating Lead Times
Waiting to order cabinets until demolition starts can delay your project by months. Place orders during design phase based on final plans. Lead times are firm commitments.
Poor Corner Solutions
Blind corner cabinets create inaccessible dead space. Budget for lazy Susans, magic corners, or pull-out systems. Corner storage solutions dramatically improve cabinet usability.
Not Leveling Properly
Cabinets installed out of level cause countertop problems, door alignment issues, and visible gaps. Take extra time to shim and level base cabinets perfectly before securing.
Frequently Asked Questions
How long does custom cabinetry take to manufacture?
Custom cabinetry typically takes 8-16 weeks from order to delivery. Semi-custom cabinets take 4-8 weeks, while stock cabinets are available in 1-2 weeks. Plan your project timeline around these lead times and order as early as possible to avoid construction delays.
What's the difference between custom, semi-custom, and stock cabinets?
Stock cabinets come in fixed sizes and limited finishes at the lowest cost. Semi-custom cabinets offer more size options and finishes with moderate customization. Custom cabinets are built to exact specifications with unlimited design options but at the highest cost and longest lead time.
Should cabinets be installed before or after flooring?
For most flooring types, install cabinets first on the subfloor, then run flooring up to the toe kick. This saves flooring material and allows easier future cabinet replacement. However, some floating floors should run under cabinets to allow proper expansion.
How do I know if my cabinet boxes are high quality?
Quality cabinet boxes use 3/4-inch plywood construction with dovetail drawer joints, soft-close hinges, and full-extension drawer slides. Check that backs are dadoed into sides, shelves are adjustable, and all edges are finished. Avoid particleboard boxes in wet areas like kitchens and baths.
What cabinet accessories are worth the investment?
Most valuable accessories include pull-out trash/recycling, lazy Susans for corners, drawer organizers, pull-out spice racks, and roll-out shelves for base cabinets. These improve functionality daily. Skip trendy gadgets that may break or rarely get used.
Related Guides
Kitchen Remodel Checklist
Complete guide to kitchen cabinetry and layout planning.
Bathroom Remodel Checklist
Vanity selection and bathroom storage solutions.
Countertop Installation
Coordinate countertop templates after cabinet installation.
Drywall Installation
Wall preparation requirements before cabinet installation.