Final PhaseStep 67 of 67Final Step

Document Your Completed Project

Congratulations on reaching the finish line! After months of planning, construction, and perseverance, your whole home remodel is complete. Now it is time to properly document this achievement for insurance, resale value, and your own lasting memories.

You Did It!

A whole home remodel is one of the most complex projects a homeowner can undertake. You navigated endless decisions, managed budgets, coordinated contractors, and lived through months of disruption. The home you are standing in today is the result of your vision, determination, and investment. Take a moment to appreciate what you have accomplished.

Quick Summary

Typical Cost

$500 - $2,500

Professional photography

Time Frame

1-3 days

Photography and documentation

Difficulty

Easy

Mostly organization work

Why Documenting Your Project Matters

Your whole home remodel represents a significant investment - likely one of the largest you will make. Professional documentation protects that investment in multiple ways and creates lasting records you will value for years to come.

For insurance purposes, documentation proves the value of improvements and the quality of work. If you ever face a claim - fire, flood, or other damage - detailed photos, receipts, and records make the difference between full replacement value and inadequate compensation. Insurance adjusters cannot value what they cannot see documented.

When it comes time to sell, buyers pay premium prices for homes with documented improvements. Professional photos showcase the quality of your remodel. Organized records of permits, contractors, and materials give buyers confidence they are purchasing a well-maintained home with quality workmanship.

Beyond practical purposes, these photos capture a moment in time. Your home is at its most pristine right now - every surface perfect, every detail complete. Life will add character over time, but these images preserve the vision you worked so hard to realize.

Complete Documentation Checklist

CategoryItems to DocumentPurpose
Professional PhotosEvery room, exterior, details, before/after comparisonsInsurance, resale, personal
Financial RecordsAll invoices, receipts, contracts, change ordersInsurance, taxes, resale
Contractor InformationNames, contacts, license numbers for all tradesWarranty claims, references
Material SpecificationsPaint colors, flooring, tile, fixtures, appliancesRepairs, matching, resale
Permits and InspectionsFinal permits, inspection reports, certificate of occupancyLegal compliance, resale
As-Built PlansFinal drawings showing actual constructionFuture modifications, resale
WarrantiesAll product and workmanship warranties with expiration datesClaims, resale value

Professional Photography Guide

Finding the Right Photographer

  • Look for architectural or interiors specialty
  • Review portfolio for similar style homes
  • Ask about equipment (wide-angle lenses, lighting)
  • Verify delivery format and usage rights
  • Get recommendations from your designer or contractor
  • Budget $800-$1,500 for quality results

Preparing for the Photo Shoot

  • Deep clean everything the day before
  • Remove personal items and clutter
  • Style surfaces with simple accessories
  • Add fresh flowers or greenery
  • Replace all light bulbs with matching color temp
  • Schedule for optimal natural light (often morning)

Shots to Request

  • Wide shots of every room
  • Detail shots of special features
  • Exterior from multiple angles
  • Dusk/twilight exterior shot
  • Kitchen and bathroom features
  • Custom millwork and built-ins
  • Before/after comparisons from same angles
  • Flow and connection between spaces

Step-by-Step Documentation Process

1

Hire a Professional Architectural Photographer

This is not the time for smartphone photos. Invest in professional photography that does justice to your completed project.

  • Search for "architectural photographer" in your area
  • Review portfolios for style matching your home
  • Get quotes from 2-3 photographers ($500-$1,500 typical)
  • Book 1-2 weeks after move-in when settled but pristine
  • Request high-resolution files and print rights
  • Ask about delivery timeline (typically 2-3 weeks)
2

Prepare Your Home for Photography

Professional photos require a styled, immaculate home. Invest time preparing each space for its best presentation.

  • Deep clean everything - floors, surfaces, windows
  • Remove personal photos, toiletries, everyday clutter
  • Add simple styling: fresh flowers, coffee table books
  • Ensure all light bulbs work and match color temperature
  • Style beds with crisp linens and decorative pillows
  • Clear countertops of most items
  • Consider renting furniture if spaces are empty
3

Create a Comprehensive Materials List

Document every material and product used throughout the project. This information is invaluable for repairs, matching, and resale.

  • Paint: Brand, color name, code, sheen, room location
  • Flooring: Type, brand, color, where purchased
  • Tile: Manufacturer, series, size, grout color
  • Countertops: Material, pattern, fabricator
  • Fixtures: Manufacturer, model numbers
  • Hardware: Finish, manufacturer, style
  • Appliances: Brand, model, serial numbers
4

Compile Complete Contractor Information

Record contact information for every contractor and subcontractor who worked on your project.

  • General contractor: Name, company, phone, email, license #
  • Electrician: Company, license #, contact
  • Plumber: Company, license #, contact
  • HVAC contractor: Company, contact
  • Roofer, flooring installer, tile setter
  • Any specialty trades (AV, pool, etc.)
  • Designer and architect if applicable
5

Organize All Financial Records

Compile all invoices, receipts, and contracts. These records are important for taxes, insurance, and resale.

  • Original contracts and change orders
  • All invoices organized by category
  • Payment records showing amounts and dates
  • Lien releases from contractors
  • Create summary spreadsheet by category
  • Calculate total project cost
  • Keep for tax and insurance purposes
6

Obtain As-Built Drawings

If construction deviated from original plans, request as-built drawings showing actual conditions.

  • Request from architect if changes were made
  • Mark up original plans with modifications
  • Note any structural changes
  • Document locations of utilities in walls/ceilings
  • Keep both original and as-built plans
  • Store digitally and physically
7

Create Digital Archive with Cloud Backup

Store all documentation digitally with cloud backup for security and accessibility.

  • Scan all paper documents
  • Create organized folder structure
  • Store professional photos at full resolution
  • Include before photos for comparison
  • Use cloud storage (Google Drive, Dropbox, iCloud)
  • Share access with spouse/partner
  • Keep local backup on external drive
8

Update Your Home Insurance

Notify your insurance company of the completed remodel and adjust coverage to reflect new value.

  • Contact your insurance agent
  • Provide summary of improvements and total cost
  • Share professional photos
  • Request dwelling coverage increase
  • Ask about discounts (new roof, electrical, security)
  • Get updated policy declaration in writing
  • Store policy with home documentation
9

Prepare Resale Documentation Package

Organize key documents that will be valuable when selling your home in the future.

  • Before and after photo comparison
  • Professional photos of completed project
  • Summary of improvements with costs
  • Permits and inspection records
  • Transferable warranties list
  • Material specifications for matching
  • Contractor contact list
  • Keep in accessible location for future sale
10

Celebrate Your Achievement

You have completed an extraordinary undertaking. Take time to appreciate and celebrate what you have accomplished.

  • Host a gathering to share your new home with friends and family
  • Create a photo book or wall display of before/after images
  • Write down lessons learned for future reference
  • Thank the contractors who did exceptional work
  • Leave positive reviews for great service providers
  • Take a moment to simply enjoy your new space
  • Exhale - you did it!

Pro Tips

Time Your Photo Shoot Carefully

Schedule photography 1-2 weeks after move-in. You want the home lived-in enough to be styled naturally but before daily life adds wear. Morning light often works best for interiors. Consider a twilight exterior shot for dramatic curb appeal.

Create a Project Summary Document

Write a one-page summary of the project: scope, timeline, total cost, key features, and notable upgrades. This becomes your elevator pitch when selling and helps appraisers understand the full value of improvements.

Keep Extra Materials Organized

Store leftover tile, flooring, paint, and hardware in a labeled location. Note quantities and exact product info. These materials are valuable for repairs and matching future additions. Include location in your documentation.

Document the Journey, Not Just the Finish

Compile key construction progress photos alongside finished images. Showing what was behind the walls - new plumbing, electrical, insulation - demonstrates quality to future buyers and insurance adjusters.

Common Mistakes to Avoid

Settling for smartphone photos

After investing so much in your remodel, cheap photos undersell the quality. Professional architectural photography captures the space, light, and details in ways phone cameras cannot. The cost is minimal compared to the project total.

Waiting too long to photograph

Your home is at its most pristine right after completion. Every day of use adds wear, scuffs, and lived-in character. Photograph within the first few weeks while everything is perfect.

Not updating insurance coverage

Your home is worth significantly more after a whole home remodel. If disaster strikes and you are underinsured, you will not receive replacement value. Update coverage immediately and provide documentation.

Losing contractor contact information

When you need warranty service or want to recommend someone, you will want those contacts. Document them now while fresh. Years from now, tracking down the tile installer who did excellent work becomes nearly impossible.

Forgetting to document paint colors and materials

When you need to touch up paint in three years, you will not remember the exact color. When a tile cracks, you will need to know the product for replacement. Document everything now while the information is available.

Frequently Asked Questions

How much does professional architectural photography cost?

Architectural photographers typically charge $500-$1,500 for a whole-home session, delivering 30-50 professionally edited images. Some charge hourly ($150-$400/hour) while others offer package pricing. Higher-end photographers with magazine credits may charge $2,000-$5,000+. For a whole home remodel, budget $800-$1,500 for quality documentation that serves insurance, resale, and personal enjoyment purposes.

Why should I document my remodel professionally?

Professional documentation serves multiple purposes: insurance claims require proof of improvements, potential buyers want to see quality of work, and you deserve beautiful images of your achievement. Professional photos capture details and quality that phone photos miss. When selling, professional photos can justify premium pricing. For insurance, detailed documentation supports replacement value claims.

What information should I document about my remodel?

Document everything: professional photos, all invoices and receipts, contractor contact information, warranties and manuals, paint colors and material specifications, as-built drawings if modified from original plans, inspection reports and permits, and a summary of total costs by category. This comprehensive record protects you for insurance, helps future buyers understand the work, and creates a complete history of improvements.

How do I update my insurance after a major remodel?

Contact your insurance agent with: summary of improvements made, total cost of the remodel, professional photos, and list of major systems/appliances added. Your coverage limits likely need to increase to reflect the home's new value. Some improvements (new roof, electrical, security) may qualify for premium discounts. Get an updated policy declaration and verify dwelling coverage is adequate.

What records should I keep for selling my home later?

Keep organized for potential buyers: before and after photos, professional photography, permit history and final inspections, list of all improvements with costs, remaining warranties (transferable ones are valuable), material specifications for repairs/matching, contractor contact list, and any notable features or upgrades. Buyers pay more when they can see and verify the quality of work performed.

Congratulations on Completing Your Whole Home Remodel!

You have reached the end of a remarkable journey. Through 67 carefully planned steps, you transformed your house into your dream home. Every decision, every challenge, every late-night discussion about tile samples has led to this moment. You are now standing in a space that reflects your vision, serves your family's needs, and represents one of the most significant investments you will ever make.

Welcome home. You earned this.

Related Guides