Step 28 of 37Flooring

Prep Concrete Floor

Properly clean and level your basement concrete floor to create the ideal foundation for subflooring and finish flooring. This critical step prevents future problems and ensures lasting results.

4-6 hrs
Preparation Time
$100-300
Materials & Tools
Moderate
Skill Level

Why Floor Prep is Critical

A basement floor that isn't properly prepared will cause endless problems with your finished flooring. High spots create voids underneath subfloor panels causing squeaks and bouncy floors. Low spots trap moisture and lead to mold. Debris prevents proper adhesion and creates bumps. Oil stains bleed through flooring materials. Proper floor prep takes a day but prevents years of frustration. Clean, level concrete provides the stable foundation your flooring needs to perform correctly and last decades.

Tools & Materials Needed

Shop Vacuum
$60-150
Concrete Cleaner
$15-30
Stiff Brush
$10-20
6-ft Level
$30-60
Concrete Filler
$20-40
Self-Leveling Compound
$40-80
Putty Knife
$8-15
Moisture Meter
$30-100

Step-by-Step Floor Prep Guide

1

Deep Clean the Concrete

Start with a completely clean surface:

  • Remove all construction debris, nails, wire, and materials
  • Sweep thoroughly with a push broom
  • Vacuum entire floor with shop vac to remove fine dust
  • Apply concrete cleaner or TSP solution to stained areas
  • Scrub oil stains with degreaser and stiff brush
  • Rinse thoroughly and allow to dry completely (24-48 hours)

Important: Remove any existing floor paint that's peeling or poorly adhered. Test by applying duct tape and pulling - if paint comes up, it all needs to go.

2

Check Floor Level

Identify problem areas that need correction:

  • Use a 6-foot level to check floor flatness in multiple directions
  • Mark high spots with chalk or marker
  • Mark low areas that may need filling
  • Check for overall slope - some pitch toward floor drains is okay
  • Identify humps, ridges, or severe dips that need correction

Tip: Most flooring types can handle gentle, consistent slopes but not sudden changes or high spots. Check your flooring manufacturer's flatness specifications.

3

Fill Cracks and Holes

Repair damaged areas for a smooth surface:

  • Use concrete crack filler for narrow cracks (less than 1/4 inch)
  • For wider cracks, use hydraulic cement or concrete patching compound
  • Clean out loose material from cracks before filling
  • Overfill slightly and smooth with putty knife
  • Fill holes left by previous fasteners or fixtures
  • Allow patches to cure per manufacturer instructions (usually 24 hours)
4

Grind High Spots (If Needed)

Remove severe bumps and ridges for a level surface:

  • Rent a concrete grinder for large areas with high spots
  • Wear respirator, safety glasses, and hearing protection
  • Work in overlapping passes to blend ground areas smoothly
  • For minor high spots, use a hand grinder or rubbing stone
  • Vacuum thoroughly to remove grinding dust
  • Re-check with level to confirm flatness

Alternative: For low spots, use self-leveling concrete compound instead of grinding high areas.

5

Final Cleaning and Moisture Test

Prepare for flooring installation:

  • Vacuum entire floor thoroughly to remove all dust and debris
  • Wipe with damp mop if needed, then allow to dry completely
  • Conduct final moisture test with moisture meter in multiple locations
  • Readings should be under 4.5% for wood flooring, under 6% for LVP
  • Floor should be dry, clean, and level before starting flooring installation
  • Keep floor clean and protected until ready to install subfloor

Pro Tips

  • Take photos of the clean, prepped floor from multiple angles for future reference
  • Mark any floor drains or utility access points so you can plan around them
  • If using self-leveling compound, prime the concrete first for better adhesion
  • Don't rush the drying process - wet concrete will cause flooring failure

Frequently Asked Questions

How level does a basement floor need to be for flooring?

Most flooring types require the floor to be level within 3/16 inch over 10 feet, or 1/8 inch over 6 feet. Luxury vinyl plank (LVP) is more forgiving and can tolerate slight variations, but engineered wood and tile need a flatter surface. Always check your specific flooring manufacturer's requirements.

Can I install flooring over painted concrete?

It depends on the paint type and adhesion. Floor paint that's well-bonded can work, but peeling or poorly adhered paint must be removed. Test by scoring the paint with a knife and applying duct tape - if tape pulls up paint, it needs removal. For floating floors with underlayment, paint condition is less critical than for glue-down installations.

How do I remove oil stains from basement concrete?

Apply a concrete degreaser or TSP (trisodium phosphate) solution to oil stains, let it sit for 15-30 minutes, then scrub with a stiff brush. For stubborn stains, use a poultice made from cat litter or sawdust mixed with degreaser. Rinse thoroughly and allow to dry completely. Oil must be removed as it prevents adhesive bonding and can bleed through flooring.

Do I need to seal concrete before installing basement flooring?

It depends on your flooring type and moisture situation. If installing DRIcore or other floating subfloor systems designed for concrete, sealing isn't usually necessary. For glue-down flooring or if moisture tests show concerns, apply a concrete sealer or moisture barrier. Always follow your flooring manufacturer's recommendations for substrate preparation.